WWTP Centar – City of Zadar

Design, build and commissioning

  • Capital infrastructure project with a high level of complexity
  • Project value: € 15.000.000
  • Waste water treatment plant capacity: 100.000 PE
  • Level 2 treatment (mechanical treatment, biological treatment, sludge treatment), submarine outfall
  • Applied technology: MBR (membrane biological reactor)
  • Maximum flow per hour in the dry season: 1.500 m3/h
  • Maximum flow per hour in the wet season: 3.000 m3/h
  • The average daily flow: 9.000 m3/h
  • The work was carried out on turnkey basis