WWTP Slavonski Brod
Design, build and commissioning
- Capital infrastructure project with a high level of complexity
- Project value: €11.600.000
- Waste water treatment plant capacity: 80.000 PE
- Level 3 treatment (mechanical treatment, biological treatment, sludge treatment and biogas treatment and utilization)
- Applied technology: SBR (C-TECH, i.e. Activated Sludge cyclic Technology)
- The work was carried out on turnkey basis (ELMAP was a member of a consortium involved in design, construction and commission of the plant)